Case Studies

Browse through some of our recent achievements.

Old War Office – Whitehall

Ardmore Construction - Contract Value : £500m 2020 - 2023

GSI were awarded the fire stopping package to this magnificent historical building in February 2020. The Grade II listed building was being brought back into use as a five-star 125 room luxury hotel including 85 very high-end apartments. The mixed used scheme is now a total 760,000 sqft and includes restaurants, boutique shops, bars and a spa with a gym and pool.

The project offered some challenges with the fire stopping detailing especially within the existing parts of the structure. On average, GSI had a team of eight NVQ Level 2 Fire Stoppers on site from the start of the project in March 2020 to practical completion in December 2023. This included full time supervision and a site-based Contracts Manager. The total value of the fire protection package came in at over £2.5 million with all the works being completed using the Nullifire product range.

Materials used: Nullifire

Talk to us about today

Please call or email to speak to one of our experienced team.

Latest case studies

Browse through some of our recent achievements.

Unity Place – Milton Keynes

View case study

Old War Office – Whitehall

View case study

Bath Road – Slough

View case study

Project Sienna – Basingstoke

View case study

Dyson – Malmesbury

View case study

Wembley – Quintain

View case study

Westfield – White City

View case study

Foundation Park – Maidenhead

View case study

Principal Place – London

View case study