Old War Office – Whitehall

Ardmore Construction - Contract Value : £500m 2020 - 2023

GSI were awarded the fire stopping package to this magnificent historical building in February 2020. The Grade II listed building was being brought back into use as a five-star 125 room luxury hotel including 85 very high-end apartments. The mixed used scheme is now a total 760,000 sqft and includes restaurants, boutique shops, bars and a spa with a gym and pool.

The project offered some challenges with the fire stopping detailing especially within the existing parts of the structure. On average, GSI had a team of eight NVQ Level 2 Fire Stoppers on site from the start of the project in March 2020 to practical completion in December 2023. This included full time supervision and a site-based Contracts Manager. The total value of the fire protection package came in at over £2.5 million with all the works being completed using the Nullifire product range.

Materials used: Nullifire

Talk to us about today

Please call or email to speak to one of our experienced team.

Latest case studies

Browse through some of our recent achievements.

Royal Academy of Arts – London

View case study

Acute Services Block – Luton & Dunstable University Hospital

View case study

Curtain House – Shoreditch

View case study

Emergency Department – Luton & Dunstable University Hospital

View case study

Paddock SEND School – Tooting

View case study

Unity Place – Milton Keynes

View case study

Old War Office – Whitehall

View case study

Bath Road – Slough

View case study

Project Sienna – Basingstoke

View case study

Dyson – Malmesbury

View case study

Wembley – Quintain

View case study

Westfield – White City

View case study

Foundation Park – Maidenhead

View case study

Principal Place – London

View case study