Case Studies

Browse through some of our recent achievements.

Unity Place – Milton Keynes

John Sisk - Contract Value: £150m 2021-2023

GSI have a long successful history of working with John Sisk spanning a period of over 15 years. We were awarded the fire stopping package for this commercial scheme in November 2021 with the project achieving practical completion in November 2023.

The state-of-the-art campus at Unity Place in Milton Keynes is now the new head office for Santander and home to 6000 employees. The building comprises of 500,00sqft of ultra-modern office space constructed over an expansive double basement. The floor plates are open plan with no ceilings and all services are exposed including where they pass through fire compartment walls and acoustic rated partitions.

As a result, the fire stopping had to not only be installed in accordance with current tested solutions, but to the highest quality as all works were on display. The project was completed using the Nullifire product range with the fire protection package being settled at just over £1.2 million.

 

Materials used: Nullifire

Talk to us about today

Please call or email to speak to one of our experienced team.

Latest case studies

Browse through some of our recent achievements.

Unity Place – Milton Keynes

View case study

Old War Office – Whitehall

View case study

Bath Road – Slough

View case study

Project Sienna – Basingstoke

View case study

Dyson – Malmesbury

View case study

Wembley – Quintain

View case study

Westfield – White City

View case study

Foundation Park – Maidenhead

View case study

Principal Place – London

View case study